British Sugar
cantley factorY upgrade
Responsible for project delivery of the ECI work packages across multiple British Sugar sites as part of the British Sugar Business Development Team.• Cantley Energy Reduction Project (C&I); delivering DCS integration solution with ABB France.• Wissington Bioethanol Expansion Project (EC&I); providing cost certainty for define and engineering solutions for scheduled enabling works.
CHH Woodproducts
drymill upgrade
- ECI Engineering lead across a Multi-million dollar project portfolio over 5 years. Specifically, project delivery of the following projects from concept through to design, build and commission. Certified validated functional safety design to PLe/PLd • Continuous Wood Kiln Drymill Project; that comprised of: • Boron treatment plant wood fully automated pack handling and wrapping process • Saw Doctor Workshop Facility • Gilbert High speed planer and waste handling system • Grading and sorting line • De-barker and Log Sorter
- • Green Mill Stacker
Civil & Marine
GGBS Processing
Electrical Project Engineer for the installation and commissioning of a cementitious product processing facility and glass aggregate operation. Key project elements included:• The specification, installation and commissioning of a 11kV 3MW Grinding Mill and a 1.5MW high pressure roll crusher.• High Voltage/Low Voltage Power Distribution and Motor Control• Natural gas aggregate flasher drier • Allen Bradley PLC and SCADA